Dear all,
I've just updated my system to the brave new world (to me) of NL, swapping out my beloved BV7-32 mk3 for a V1. While I was at it I replaced my Masterlink Gateway with the Beolink Gateway, and also invested in a Blink Nl/Ml converter so I can join my existing ML network to the party.
I love the user experience of the V1, and I'm seriously impressed with the NL/ML converter, which is making things work like B&O should. My only problems occur when I try and bring the BLGW into the mix. My setup is as follows:
Main TV - BeoPlay V1 (no relevant option setting when using Beoremote One - defaults to VM1) integrated with the Nl/ML converter but set as in different room and not sharing speakers. Set up to forward light/command signals to the BLGW as per the beoliving website instructions.
ML VideoMaster - NL/ML converter connected to Bomaster 7000 (option 0) via 1611 converter (as per idea catalogue)
Audio Slaves - 2 Beolink Actives and 5 Blink Passives, all most recent software with settings to forward command/light to the BLGW and in option 6
BLGW
Video slaves - BeoVision 7-32 mk3 and BeoCenter 6-26 both in option 6 (not currently connected)
At the moment I'm able to use the V1 and the NL/ML converter with my BeoMaster 7000 perfectly - everything works as it should, and the audio slaves all work as expected too. However, as soon as I connect the BLGW it is as if there is some kind of master-link conflict - the ML side of the network becomes unresponsive to IR commands and I cannot capture commands from the master-link on the BLGW. I'm occasionally able to force the BLGW to recognise one of the passives, and can even control those sources via the believing app, but the IR sensors are dead.
I'm pulling my hair out as I've spent the last week changing master-link cables, resetting devices, powering up and down in different orders, and setting up test systems to make sure all the components work properly.
Incidentally the mlgw works perfectly with the setup; the only reason I'm keen to get the BLGW up and running in its place is the onscreen overlays on the V1 for my automation system.
Does anyone have any suggestions on what the problem might be?
I'm at a bit of a loss, although it did spring to mind that maybe I need a master-link power box in the absence of a ML VideoMaster? Would connecting a BV in option 6 help here?
Sorry if this is a really stupid question... I've read as much as I could from the ideas catalogue, the BLGW manuals and the NL/ML installation guide