Change order of List menu for TV

4 replies

Hello there

When I had the IR only version of the Beoremote one with my avant 55 I could change the sort order of the functions in the list for TV menu.

Since moving to the BT version the TV and MUSIC options are according to the TV setup,

BUT the list menu cannot be resorted.

is there a way to do this?

I would like my Homecontrol function to be at the top of the list.

Cheers

Sean

Even though it's a delayed response. 

AFAIK, there is no way. 

Yes, you used to be able to do this, but now with BT, it's two way and it takes the sources from the device.  

You can change the order of the devices, eg; if you want BV14 to appear at the top or BeoPlay A6, but control will always be under these. 

Sean, did you ever get this sorted?

 

Regards

Michael. 

I have a related question. In my list menu (TV) I have two time the same item. But in the app list of my (LG) TV only one time this ithem. Also I have under de list the item HDMI A, but have nothing connected to the HDMI A port. (the Stage is connected to a LG TV).

or
BeoWorld Gold Membership card
Join BeoWorld

Register to access the forums, reference material, and exclusive member benefits — including our monthly prize draw.

Become a Member

December 2026 Prize Draw

Gold Members Only

As a Gold member you're automatically entered into our exclusive prize draw — your chance to win iconic Bang & Olufsen products. A unique benefit of BeoWorld Gold membership, every draw brings a new opportunity to win something special.