A few days after this the electrician turned up to do all the sockets, light switch and phone points, unfortunately i was so busy helping him, i didnt get any photos of the electrics going in (i had already done all the chasing out and fixing of the back boxes). And now with only the weekend to spare before the plaster turned up i had to prepare for him.
First thing was the fit some polystyrene sheets between the batons on the two wall with the cableing. This was to A:- act as some type of soundproofing and B:- to give some insulation to these walls.